Ice on the footway/cycleway at the top of this busway bridge over the railway, where there’s a shadow from the wall.
Ice on the footway/cycleway at the top of this busway bridge over the railway, where there’s a shadow from the wall.
Very icy surface on some patches of the cycleway between Sawston and Stapleford, particularly in the shadows. The road was being gritted but not yet the cycleway. Cambridge Road, Sawston
Very icy surface on some patches of the cycleway between Sawston and Stapleford, particularly in the shadows. The road was being gritted but not yet the cycleway. Cambridge Road, Sawston
Very icy surface on some patches of the cycleway between Sawston and Stapleford, particularly in the shadows. The road was being gritted but not yet the cycleway. Cambridge Road, Sawston
Very icy surface on some patches of the cycleway between Sawston and Stapleford, particularly in the shadows. The road was being gritted but not yet the cycleway. Cambridge Road, Sawston
Very icy surface on some patches of the cycleway between Sawston and Stapleford, particularly in the shadows. The road was being gritted but not yet the cycleway. Cambridge Road, Sawston
Very icy surface on some patches of the cycleway between Sawston and Stapleford, particularly in the shadows. The road was being gritted but not yet the cycleway. Cambridge Road, Sawston
Very icy surface on some patches of the cycleway between Sawston and Stapleford, particularly in the shadows. The road was being gritted but not yet the cycleway. Cambridge Road, Sawston
This sign does not appear to be associated with any works and no similar signs are encountered when approaching from the opposite direction.
These signs do not appear to be associated with any works and no similar signs are encountered when approaching from the opposite direction. Reported at: https://highwaysreporting.cambridgeshire.gov.uk?id=00358333
Preparations on the south side of Newmarket Road for the Chisholm Trail underpass. The footway diversion is very narrow, and some cyclists are using the roadway.
Great Shelford Broken bollard was reported at: https://highwaysreporting.cambridgeshire.gov.uk?id=00358336
The first Voi bike I’ve seen in Cambridge. I already had a Voi account but after ten minutes of trying could not unlock this one. Voi site: https://www.voiscooters.com/introducing-e-bikes/
Voi ebike and escooters on Parker’s Piece. I took the ebike here out for an 18 minutes ride which cost £3.70. It is electric assist and although the bike feels a little heavy it was easy and fun to ride. There were two problems: the f ... [more]
The Unstrut-Leine Verbindungsfernweg EIC UNS cycleway leads over the watershed between the Leine river in Lower Saxony and the Unstrut in Thuringia.
All seven bridges connecting the two sides of the city of Görlitz over the Neisse River were all blown up by the retreating German army in May 1945. This modern bridge to the old town and old town and Zgorzelec is blocked for motorised veh ... [more]